Program BuildingIn order to successfully pass an audit the plant must achieve a passing score of 80% by an approved auditor using an approved audit instrument.
|
There are 5 elements to the audit including:
QC Manual-MandatoryThe Q.C. manual is mandatory and the audit will not pass if there is not a manual that includes:
|
Internal Inspections-40%The plant must be able to prove that they are conduction a minimum of 3 truss inspections per operational set-up per week. There must be a minimum of 6 months of records to review and the plant must provide an adequate summary of internal inspections. There must be documentation for:
|
Design-10%If the Quality Control Manager is not familiar with producing Truss Design Drawings, they may assign this requirement to the Design Manager, but the Q.C. manager is still responsible to ensure that requirements are met.
The company must ensure that trusses are designed in accordance with the current TPIC guidelines and procedures. The auditor will:
|
Program Building TrainingIn order to build your Quality Control System resources and training may be available though your Regional Truss Association.
|